The short answer
West Berkshire Council deals with planning in Hungerford, and building control is served by Building Control Solutions for the council. St Lawrence's is a Grade II* listed Church of England church, so its roofs follow the church's own faculty process rather than ordinary listed building consent.
Plenty of roof work in Hungerford needs no application whatever. Swapping out cracked tiles, refixing a few that have dropped, or setting a ridge back on a fresh bed of matching mortar counts as maintenance. Three situations change the picture.
Q3.1When does a bigger re-cover need approval?
Once a re-cover reaches 25 per cent of the whole building envelope, or half the roof area, Building Regulations come into play, and a thermal upgrade can follow. So does a new covering at least 15 per cent heavier than the old one. West Berkshire is served by Building Control Solutions. Where work is notifiable, we explain the route and see to the notification.
Q3.2What if I want to change the look?
Hungerford has a designated conservation area. Work that returns a roof to how it looked leaves the High Street unchanged, so an application is unlikely. A different material, or roof windows on a street-facing slope, deserves a conversation with West Berkshire Council first. Our skylights page covers the planning side of roof windows.
Q3.3How are listed buildings and the church handled?
St Lawrence's was rebuilt in 1814 to 1816 in Gothic Revival style and is Grade II* listed. St Lawrence's belongs to the Church of England and is in use, so alterations go through the faculty system rather than listed building consent. A listed house on the High Street is different: works that alter its special character need consent, and a change of roofing material can do exactly that.
Unsure about your own house, listed or inside the conservation boundary? The council can confirm either point before a price is agreed, and we will help you frame the question. Knowing at the start avoids an awkward stop halfway through a job, with scaffolding already up and the tiles on site.