The short answer
Stone slates hang from battens in diminishing courses, graded from massive slabs at the eaves to small pieces up at the ridge. A peg or nail at the head of each one holds it up, so one rotten fixing can let a stone slip and leave a gap higher up the slope.
Heddington's best-known roof is the one over St Andrew's. The church was practically rebuilt in the 13th century and its stone slate covering sits on walls of ashlar and rubble stone. It is a handy roof to study, because it shows how stone slate is meant to be built, even if your own house is a good deal smaller.
Q1.1How do the courses run?
Stone slates are not cut to a single size. Along the eaves sit the largest, often in a doubled course, and sizes fall steadily as the roof climbs, which is what builders mean by diminishing courses. Every stone is drilled near the top and hung on a batten with a peg or nail, and the course below hides that fixing. When a fixing fails, the stone above slips, so one rotten peg can appear as a gap three courses higher.
Q1.2What does the weight ask of the timbers?
Stone is heavy. Cotswold District Council's technical guidance for owners, written in 2000, reckons a covering of stone slate comes to roughly 1000 kg for each 10 square metres. That load rests on rafters and wall plates that may be centuries old, so we inspect the timbers before trusting them with a re-laid slope. A sagging ridge line, a bellied slope or daylight at the wall head all say the frame needs attention first.
Q1.3What if the house has another covering?
We never guess what an older house in the parish is roofed with. Clay tile, slate and stone slate all turn up on rural buildings of this age, and each wants different handling. A roof patched over the decades with whatever came to hand is common, so working out which stones, tiles or slates belong to the original is the opening task of a survey. Our roof repairs and pitched roofing pages describe the methods we use on each.
The same sorting applies at the ridge. Stone ridges, clay ridge tiles and concrete ones are all bedded and fixed differently, and a mismatched ridge is often the first sign of an earlier, hurried repair.